Manufacturing lead generation for industrial B2B
GrowthPal runs outbound for companies selling into manufacturers, and for manufacturers selling to their own OEM, Tier 1 and distributor buyers. Finding plants is easy, so the work goes into resolving each site to a named person with the right commodity scope and giving them a reason to read. Best fit is past 3M in ARR, an offer people already buy, a team ready to take calls, and roughly 30,000 reachable contacts.
Who you are really selling to
| Role | What they care about | Where they pay attention | Best channel |
|---|---|---|---|
| VP Operations or Director of Manufacturing | Throughput, OEE, unplanned downtime, scrap and rework, on-time delivery, and whether a new line hits its ramp date. Usually owns the plant P&L in a mid-market firm. | Peers at other plants, their own OEM customers, trade press for their specific process, and a short list of trusted reps. | Email, short, carrying one plant-specific observation. A call to the plant switchboard asking for them by name works as the follow-up. LinkedIn works at larger firms and poorly at family-owned shops. |
| Plant Manager or Site Manager | This site and nothing else. Safety record, labor turnover, maintenance backlog, hitting the schedule, keeping corporate off their back. | Anything that solves a problem they had this week. Category pitches get ignored. | Phone first in many cases. If email, tie it to a visible site event: a new line, an expansion, a hiring push, an inspection. Anything that reads like a corporate program is dead on arrival. |
| Procurement Manager, Commodity Buyer or Director of Supply Chain | Supply continuity, dual sourcing, supplier risk, total cost of ownership rather than unit price, lead times, and getting a second source qualified before the incumbent fails. | Resourcing, qualification, lead time and category risk. Their scope is usually one commodity, such as castings, fasteners, electronics, resins or packaging. | Email written as a supplier introduction rather than a marketing pitch. Name the part family. Put capability and certification facts in the first message. Expect to be routed into a supplier registration portal, which is a real outcome and a slow one. |
| Quality Manager or Quality Director | Audits, nonconformances, 8D and corrective action, PPAP submissions, customer scorecards, and keeping certification. | Standards changes, audit findings, and customer-specific requirements flowed down from their OEM customers. | Email that uses the standard correctly, with the revision and the certified scope. Wrong terminology here ends the conversation in one line. |
| Engineering Manager or Manufacturing Engineer | Design for manufacturability, tolerances, process capability, fixturing, cycle time, and whether a part can be made at volume without drama. | Technical specifics. A drawing-level comment gets read and everything else gets skipped. | Email with one concrete technical observation or a capability fit statement. Often the internal champion who pulls procurement in, so engineering and procurement get sequenced together. |
What makes outbound different here
Nobody can buy from you until you are an approved supplier
Qualification runs in stages: a supplier self-assessment questionnaire, document and certificate review, often an on-site or remote audit, a quality agreement, then a pilot run or first article before approval. Placement on the approved vendor list is scoped, so clearance for one part family does not carry to another, and approval at one site of a group does not carry across the group.
What it decides: The first ask and the pacing. The ask is a capability review, a supplier registration, a sample or first article, or a spot on the bid list for the next RFQ, never a demo. Sequences run long, because a cycle measured in quarters does not fit a two-week cadence.The shared inbox is staffed to route RFQs, not to assess vendors
Industrial sites publish info@, sales@, rfq@ and a contact form. Those routes reach an inside sales or customer service person whose job is to pass incoming RFQs to the right desk. A vendor approach has no desk to be passed to, so it stops there. Meanwhile procurement scope is split by commodity and by site, so a single company-level record cannot point at the person who owns your category in the first place.
What it decides: Where list budget goes. Effort per record goes up and record count comes down, because the person layer is the deliverable. Where no named address resolves, the row gets a phone or LinkedIn path instead of defaulting to the generic mailbox.Scope is by commodity and by site, not by company
A firm with eight plants has eight plant managers, several commodity buyers split by category, and a corporate supply chain function that may not control site spend at all. Treating the parent as one record collapses all of that into a single wrong guess.
What it decides: The list schema and the angle. Every row carries a site and a part family, and the copy names one or both. Corporate-level sends across a multi-plant group read as mass mail and get treated that way.Technical credibility is judged in one line
Wrong unit, wrong standard, wrong process name, or a tolerance that makes no sense, and the message is finished. Writing ISO 9001 with no revision or certified scope signals an outsider, and so does calling a stamping a casting.
What it decides: Segmentation. The list is cut by process and material so each segment gets copy written in its own vocabulary. One message never runs across unrelated process types, which caps how wide any single angle can go.The plant calendar outranks your sending calendar
Shutdown weeks, model year changeovers, peak production seasons and show weeks move attention completely. During a show week the people you want are standing on a trade show floor.
What it decides: Pacing. Send dates come off the segment's own calendar. Show dates are used deliberately, before or after and not during, and quiet periods around shutdowns are planned for rather than pushed through.Buying triggers, and the angle each one earns
| Trigger | How we find it | The angle it earns | Proof the email needs |
|---|---|---|---|
| New plant, expansion or new line announced | State and county economic development agency press releases, local and regional business press, building permit records, company newsroom pages, and job postings for a site that did not previously exist. | Ramp risk. A new line needs tooling, MRO supply, qualified labor and a second source before the first production run. | The specific site and what is being added, plus one sentence on what usually goes wrong at that stage of a line ramp. |
| Hiring pattern shift | Careers pages and job boards. A cluster of openings for maintenance technicians, CNC machinists, quality engineers, supply chain analysts, or a first ERP role. | Whatever the hiring is compensating for. Maintenance hiring points at reliability. Quality engineer hiring points at audit or scorecard pressure. | The roles and the count, named, with one inference drawn carefully rather than asserted. |
| New or renewed certification | Company press pages, accredited certification body client directories, and the IATF certificate validity check for automotive sites. | A first AS9100 or IATF 16949 certificate means the firm is chasing a new customer segment, which brings new documentation, new audits, and often sub-tier suppliers who must meet the same requirements. | The exact standard, the revision and the certified scope statement, read from the issuing register rather than the company website. |
| Open RFQ or active sourcing event | DLA DIBBS, which carries RFQs, RFPs and awards for defense supply items and can be searched without logging in. SAM.gov for wider federal notices. Large private firms publish open sourcing events in their supplier portals. | The buyer is in market right now for a defined part or category, so the email can be about one part rather than a relationship. | The solicitation number or part family, and evidence you can actually make or supply it at that volume. |
| Trade show exhibitor listing | Official exhibitor directories, which publish well before the show. IMTS publishes through Map Your Show and FABTECH publishes an exhibitor list, as do regional and vertical shows in plastics, packaging, food processing and aerospace supply. | A paid booth in a defined category is a budget and intent signal, and the listing is a self-declared capability statement. | The show, the booth and the product category they listed, referenced before or just after the show rather than during it. |
| Automation, ERP or MES investment | Job postings naming a specific ERP or MES, integrator and vendor case study pages, press releases, posts by the IT or operations lead, and grant or incentive award listings. | A system change opens everything attached to it: data cleanup, training, integration, process redesign, and the backlog the project does not cover. | The system named and the stage it is at. Mid-implementation and a year past go-live are different conversations. |
| Tariff or resourcing exposure | Section 232 measures on steel and aluminum were widened to cover derivative products, which pulls in firms that never imported raw metal. Import records, public filings, investor calls, and association testimony in comment dockets name the affected part families. | A second domestic source, or help tracing sub-tier content. The honest part matters: resourcing in regulated and automotive supply is slow because a new source needs PPAP or an equivalent customer approval, so the pain outlasts the policy. | The specific input or part family, and a plain statement about qualification timing rather than a promise of speed. |
| Public compliance or inspection record | EPA ECHO holds permit and compliance history for regulated facilities, searchable by location and facility type and refreshed weekly. OSHA Establishment Search holds inspection records going back to 1972, updated daily and filterable by industry code. | Environmental, health and safety remediation, equipment, training or consulting, where the offer genuinely addresses what the record shows. | The public record referenced factually, with no implied judgment. Used clumsily this is the fastest way to be blocked, so it runs only where the fit is real. |
Example angles we would test
Examples of angles to race in this market, not results. Each one is a hypothesis with its proof assembled before a single send.
You are standing up a new line and you do not have a qualified second source for the critical input yet.
- Proof it needs
- The named site, the announcement date, and the specific part family you can supply.
- The ask
- A capability review before the first production run.
You have had maintenance technician openings up for months, which usually means downtime is already eating the schedule.
- Proof it needs
- The roles, the count and the site, with one careful inference about coverage.
- The ask
- Fifteen minutes on how the gap is being covered now.
You just certified to a new standard, so your customer is about to ask the same questions of your sub-tier.
- Proof it needs
- The standard, revision and certified scope taken from the issuing register.
- The ask
- A place on the bid list for that scope.
You are carrying exposure on a derivative part you never imported directly, and qualifying an alternative takes longer than the news cycle.
- Proof it needs
- The part family stated in their terms, plus an honest account of PPAP timing.
- The ask
- A first article or a sample run on one part.
Your ERP project is consuming the operations team, so the shop floor data problem is being deferred.
- Proof it needs
- The system named and the implementation stage, with what usually gets left out of scope.
- The ask
- A short conversation with the project lead rather than the executive sponsor.
You paid for a booth in this category, which means you have a growth target in it.
- Proof it needs
- The show, the booth and the product category they listed, with a capability statement that matches it.
- The ask
- A call the week after the show, referencing what they showed.
You are single sourced on a part and it has been on a list you never get to.
- Proof it needs
- Capability stated in their vocabulary: process, material, tolerance band, volume range, certifications held and their scope.
- The ask
- A quote on one part, not a relationship.
Your scorecard is under pressure on delivery or PPM and you need capacity relief without advertising it.
- Proof it needs
- A public signal such as a quality role opening or a changed supplier requirement, plus comparable process capability.
- The ask
- An overflow or surge capacity conversation.
A permit filing for your expansion is public before any announcement is, so this is early.
- Proof it needs
- The filing and its date, read from the permit record.
- The ask
- An introduction to whoever owns the project.
How the list gets built in this market
Company records in manufacturing are close to free. Permits, inspections, certification registers, state filings and exhibitor directories all list factories in public. The method is to build the company layer cheaply from those records, then spend the effort on resolving each site to a named person and verifying it. Lists for Wattstor were built this way, from UK public sources including the ESOS register.
Government and regulatory registries
- EPA ECHO, for facility-level permit and compliance records across regulated US sites, searchable by location and facility type, downloadable, refreshed weekly, with ECHO Exporter and web services for bulk access.
- OSHA Establishment Search, for inspection records since 1972, updated daily from OSHA area and state plan offices. Confirms a site is operating and gives the legal establishment name, which is often not the marketing name.
- US Census NAICS definitions and County Business Patterns, to size a segment by code and geography and to sanity-check that the segment exists at the density your list implies.
- SAM.gov and DLA DIBBS. SAM registration is required before a vendor can hold a DIBBS account, and DIBBS search works without one. Useful as a company source and as an in-market trigger at the same time.
- State business registries and state manufacturer directories, for registered agent, officers, filing history and incorporation date. Coverage and cost vary by state.
- UK Companies House, for filings, officers and SIC codes.
- UK ESOS notification data published on data.gov.uk by the Environment Agency. ESOS applies to large UK undertakings, defined as employing 250 or more people or meeting turnover and balance sheet thresholds. The government states the published data is unverified for compliance and contains no personal data, so it is a company-level signal and never contact data.
Industry and trade directories
- Thomasnet, for category mapping and capability tags. Supplier placement there is paid, so the ordering reflects spend rather than capability and it is never used as a ranking.
- Association member directories: NAM, SME, FMA, PMA, PMPA, NTMA, AMT and the vertical bodies for plastics, packaging, food processing and aerospace. Paying dues is a usable quality filter.
- NIST MEP National Network. Centers operate in all 50 states and Puerto Rico and work with small and mid-sized manufacturers, which NIST describes as the bulk of the US manufacturing base. Client stories and event pages name real local firms and often name people at them.
- Certification registers, including the IATF certificate validity check for automotive sites and accredited certification body client directories for ISO 9001, AS9100 and IATF 16949. The standard, the revision and the certified scope are what carry information.
Trade show exhibitor data
- Official exhibitor directories, published in advance with booth number, product category and company description. IMTS publishes through Map Your Show and FABTECH publishes an exhibitor list.
- Regional and vertical show directories for plastics, packaging, food processing and aerospace supply, which are self-declared capability statements and the best intent-plus-category source in this market.
- Attendee lists are not public. Organizers hold them. Nothing claiming to be one gets bought without understanding its provenance, and third-party counts for the same show frequently disagree.
The person layer, where the effort actually goes
- Resolve the site, not the brand. Start from the establishment name in the regulatory record and map it to the operating entity and the plant address.
- Find the named person by function and scope: the buyer for your commodity, or the manager of that specific site.
- Confirm them in more than one place. A profile plus a conference agenda, a quality manual signature page, an association committee list, a patent assignee record, a press quote or a webinar panel.
- Derive the email pattern from a known-good example at the same domain, then verify the specific address.
- Record the evidence on the row. If an email cannot cite the reason it exists, the record is not finished.
How a row gets verified
- Confirm role and site from two independent public sources, each stored on the row with its URL and the date it was read.
- Verify the address technically, and flag catch-all domains rather than trusting them. A catch-all accepts everything and proves nothing, so those rows go to a phone or LinkedIn path.
- Date the trigger. A plant announcement from three years ago is not a trigger, and a certificate that has lapsed is worse than none.
- Check certification claims against the issuing register rather than the company's own website, and record the certified scope, not just the standard.
- Deduplicate across sites of the same parent, then suppress existing customers, active suppliers, and anyone who previously asked not to be contacted.
What makes a bad list here
- Generic mailboxes: info@, sales@, rfq@, purchasing@, contact@. These are the default output of scraping industrial directories, and they reach a desk that routes inbound RFQs rather than one that assesses vendors.
- One corporate HQ record standing in for twelve plants, which leaves the copy unable to name a site.
- A job title with no scope. A buyer at a firm that purchases forty unrelated commodities is not the buyer for yours.
- Stale establishment data. Regulatory records persist after a plant closes or changes hands, so every row needs a current cross-check: a live job posting, a current certificate, a recent filing.
- An industry code taken at face value. A registered NAICS code is often what the firm filed years ago, not what it makes today.
- Distributors and sales reps mixed in with producers. Many directory listings are agents with no plant, no quality system and no procurement function of the kind you want.
- Bought exhibitor or attendee files of unknown provenance. Counts conflict, consent is unclear, and everyone else who bought the file has already mailed it.
- Mass-scraped certification lists. ISO 9001 is close to universal in some segments, so on its own it filters nothing.
Compliance and trust constraints
Nothing here is legal advice. Check your own position with qualified counsel in each jurisdiction, and read each source directly, because rules and thresholds change. Three points matter more in this market than in most.
Export control makes a routine ask into a problem for the recipient
Where prospects hold ITAR or EAR obligations, or where your offer touches controlled technical data, asking for drawings or specifications in a cold email can create an obligation for the person who replies. Defense and aerospace suppliers are trained to refuse it. First emails ask for a capability conversation or a questionnaire, not a print.
Read the source
Public compliance records are legal to use and easy to misuse
EPA ECHO and OSHA inspection records are public, so referencing them is lawful. It can still read as hostile. Where a record is used as a trigger, it is stated factually, without implying wrongdoing, and only where the offer genuinely addresses what the record shows. Where that fit is not there, the record is used for targeting and never mentioned in the copy.
Read the source
A published supplier portal policy is a rule, not an obstacle
Many large manufacturers state publicly that all vendor approaches go through a registration portal. Where that policy exists, the registration still goes through the portal. Outbound is used to make sure the person who owns the commodity knows the registration exists and what scope it covers, so it is read rather than left in a queue. Treating the portal as something to route around is how a firm gets blocked across every site in the group.
Read the retailer or regulator source directly.A targeting brief for this market, in full
GrowthPal fills in the document below before a single row is built, and publishes it whole rather than as a screenshot, because the shape of it is the argument. Every field comes from a public source before any call happens.
| Field | What goes in it |
|---|---|
| Direction | Selling into manufacturers, or a manufacturer selling out to OEM, Tier 1 and distributor buyers. The two use different lists and different proof, so one is chosen. |
| Process, material and part family | The specific process and material the copy will be written in, and the category the buyer owns. Stampings, castings, molded parts and assemblies are separate segments with separate lists, never one blended send, and the part family goes on the row and into the first line of the email. |
| Site, not parent | The plant address and the legal establishment name taken from the regulatory record, mapped to the operating entity. A multi-plant group is several rows, not one. |
| Trigger and its date | The dated public event that earns the email, with the URL it was read from. A line ramp, a certificate, an open RFQ, a hiring cluster, a permit filing, an exhibitor listing. |
| Capability statement | Processes run, materials handled, tolerance bands, volume ranges, and certifications held with their certified scope and revision, checked against the issuing register. |
| Qualification position | Where you would sit in their process today: questionnaire, document review, audit, quality agreement, first article, or already approved for a different part family at a different site. |
| The ask | Named explicitly so the sequence cannot drift back to asking for a demo. A capability review, a supplier registration, a sample or first article, or a place on the bid list for the next RFQ. |
| Calendar field | Shutdown weeks, model year changeover, peak production season and show dates for this segment. Send dates are derived from this field rather than from a weekly sending plan. |
| Disqualifiers | Generic mailboxes, parent-only records, titles with no commodity scope, stale establishment data, industry codes taken at face value, distributors listed as producers, catch-all domains, and prior opt-outs. |
| What would tell us this is wrong | Written down before sending. A hypothesis with no failure condition cannot teach you anything, because no result would ever count against it. |
We publish the brief rather than a dashboard screenshot because a screenshot proves a number and a brief proves a method. Copying this means copying how we work, which is the point.
How the engagement runs
Three stages and nine steps, the same ones in every market: build the list from public sources, race message angles against it, scale the one that wins. The nine steps from kickoff to booked meetings are written out in full.
What changes for this market
- Week one settles scope before anything is built: which processes, materials, volume ranges and certifications you can actually claim, and which part families you want to be known for. That capability statement becomes the spine of every angle, because copy that is not technically exact gets discarded in one line here.
- List building splits into two passes. The company layer comes cheaply from public records: EPA ECHO, OSHA Establishment Search, state filings, association and certification registers, exhibitor directories, and Companies House or the ESOS data in the UK. The person layer takes the time, resolving each site to a named buyer or manager with the right commodity scope and confirming it from two independent sources.
- The send calendar comes off the plant calendar. Shutdown weeks, model year changeovers and show weeks are mapped onto the segment before a single date is set, and show listings are used the week after rather than during. Sequences run longer than in most markets, because a qualification cycle measured in quarters does not respond to a two-week cadence.
- The first ask is sized to the gate. Angles are built toward a capability review, a supplier registration, a sample or first article, or a place on the bid list for the next RFQ. Where a prospect publishes a supplier portal policy, the registration goes through the portal and the email exists to make sure the commodity owner knows it is there.
What GrowthPal has published
| What was published | What the figure counts | Source |
|---|---|---|
| 4M+ cold emails sent for 40+ B2B companies | Emails sent, cumulative across all clients. Not one campaign. | Read it |
| 130 positive replies from 27,621 emails in April | Emails sent. | Read it |
| A meeting booked with a billion-dollar company on the first day of the campaign, with lists built from UK public sources including the ESOS register | Not a rate. A single named event. | Read it |
| A study of 412 campaigns across 47 companies over 18 months: campaigns scoring above 0.7 on the composite message-market fit score averaged an 11.4 percent reply rate, against 1.1 percent for campaigns below 0.3. Volume, warm-up and time of day explained less than 8 percent of the variance. | Total reply rate, measured against messages in those campaigns. This is a different measure from interested replies per contact and the two must never be compared on the same page. | Read it |
How these are counted
An interested reply means a human reply expressing interest in continuing the conversation. Out-of-office messages, unsubscribes, referrals to someone else and automated responses are not counted. A figure measured against contacts reached and a figure measured against emails sent are different measures: the column above says which each one is, and we do not convert between them or add them together.
The full counting method, and what an interested reply is.Who this is not for
- You need orders this quarter. Supplier qualification runs through a questionnaire, document review, often an audit, a quality agreement and a first article before anyone can raise a purchase order. Replies arrive in weeks. Revenue does not. If the plan depends on signed business inside a quarter, outbound is the wrong instrument for it.
- A market smaller than roughly 30,000 reachable contacts. Testing needs volume to separate a message that works from one that got lucky. This market already pushes record counts down, because the effort sits in person-level resolution. Below that size a smaller, more manual approach run by your own team usually beats a system.
- Your capability statement is not written yet. Industrial buyers judge a sender in one line. If you cannot state the processes you run, the materials you handle, your volume ranges, and the certifications you hold with their scope, no angle will survive first contact. That is a positioning problem, not a sending problem.
- Nobody can answer a technical reply within a day. A reply here is often a question about tolerance, capacity, lead time or a standard. A sales person who has to go and ask loses the thread. Someone technical needs to be on the follow-up, not just a calendar link.
- You want one message across every process type. Copy that covers stampings, castings, molded parts and assemblies at once cannot be technically exact about any of them. If the offer genuinely spans unrelated processes, each one is a separate segment with its own list and its own copy, which is a larger engagement than many firms want.
Answered straight
What PPAP level would we be asked to submit at?
Whatever the customer-specific requirement states, which is a question for their quality team rather than something a supplier assumes. The level sets what is submitted against what is retained: the control plan, PFMEA, measurement system analysis, dimensional results, material and performance test results, and the part submission warrant. Where the requirement is not yet defined for the part, settling it before anyone quotes is worth doing, because it changes the timeline.
How do we answer a question about critical-to-function tolerances in a first reply?
By separating the features that govern whether the part works from the rest, rather than promising the whole print. The useful reply agrees which dimensions are designated critical, what capability index is required, the inspection method and gauging, and whether first article approval comes before production. Tight tolerances applied to non-critical features change the process route for no reason, so a review of the print against actual function usually comes first.
Why not just email the addresses on the contact page?
Because those addresses reach a desk built for a different job. An inside sales or customer service person watches info@, sales@ and rfq@ to route incoming requests for quotation to the right buyer. A vendor approach has no request attached, so there is nothing to route. Procurement scope is also split by commodity and by site, which means a single company-level address cannot point at the person who owns your category even in principle.
The prospect said to use their supplier portal. Is that a brush-off?
Usually not. It is the correct process and it is worth following. The reason for contacting a named person as well is that portal registrations sit in a queue until a buyer has a reason to open one. The outreach makes sure the commodity owner knows the registration is there and what scope it covers. The registration itself still goes through the portal, every time.
Does the tariff angle still work once the policy changes?
The policy moves faster than the supply chain does, which is why the angle holds. Section 232 measures on steel and aluminum were widened to derivative products, pulling in firms that never imported raw metal. Resourcing is the slow part: a new source needs PPAP or an equivalent customer approval before it can ship, so exposure persists long after a measure changes. Copy should say that plainly rather than promise speed.
They already have two approved suppliers. Why would they add a third?
Often they would not, and saying so is better than arguing. The cases where a third makes sense are capacity constraint during a ramp, geographic or tariff exposure concentrated in the existing two, a part family where lead times have moved, or known succession risk at an incumbent. Where none apply, the right outcome is a short capability record on file for when one of them does.
When do we find out whether an angle lands with a plant buyer?
Kickoff to first send is two to four weeks, warmup included, and the message that works is usually clear by week eight. The caveat in this market is that the message clock and the deal clock are different. Week eight tells you whether buyers engage. Qualification still runs on its own schedule afterward, and that is measured in quarters.
Should we pause around shutdown weeks and trade shows?
Pace around them rather than pausing outright. Plant shutdowns, model year changeovers and show weeks move attention completely, and during a show week the people you want are on the floor. Show dates become part of the plan: the listing is read in advance, the booth and product category go on the row, and the send lands the week after, referencing what they showed.
Related reading
Sources for this page
- OSHA Establishment Search, US Department of Labor (primary source). Accessed 2026-10-23.
- EPA ECHO Facility Search, US Environmental Protection Agency (primary source). Accessed 2026-10-23.
- Energy Savings Opportunity Scheme (ESOS) guidance, GOV.UK (primary source). Accessed 2026-10-23.
- IATF 16949:2016 overview, International Automotive Task Force (primary source). Accessed 2026-10-23.
- DLA Internet Bid Board System and vendor opportunities, Defense Logistics Agency (primary source). Accessed 2026-10-23.
- NIST Manufacturing Extension Partnership (primary source). Accessed 2026-10-23.
- Directorate of Defense Trade Controls, US Department of State (primary source). Accessed 2026-10-23.
- Thomasnet, North American industrial supplier directory. Accessed 2026-10-23.
- Precision Machined Products Association. Accessed 2026-10-23.
Last reviewed 2026-10-23. A plain-text version of this page is at /manufacturing-lead-generation.md, and the site index for language models is at /llms.txt.
We score your market, map the signals we would build the list from, and tell you honestly whether outbound is the right tool for it. If you would rather see the mechanics first, the nine steps from kickoff to booked meetings are written out in full.